Semiconductors

NVIDIA

Critical38/104 relationships sourcedProfile verified Sep 1, 2026

30-Second Executive Brief

Executive Assessment

NVIDIA functions as a systemically important institution within Semiconductors, backed by 48% sourcing coverage, with accelerating strategic relevance.

  • Maintains 104 mapped relationships across the graph
  • 48% sourcing coverage across sourced relationships
  • Tracked as systemically important institution within the Semiconductors category

Executive Snapshot

Strategic Role
Systemically Important Institution
Sourcing Coverage
48%
View Methodology →

Computed live from this entity's own relationships and evidence: how many relationships carry at least one linked citation, weighted with citation recency and source type — independent of Strategic Importance, and not a prediction. Not a hand-typed number; recalculated on every read.

Ecosystem Influence
Very High
Strategic Momentum
Accelerating

Coverage

Evidence Sources
27
Mapped Relationships
104
Technology Domains
5

Strategic Implications

  • Central node connecting multiple strategic ecosystems
  • Directly influences technology and capital flows
  • Material relevance to downstream dependency mapping

Top Opportunities

Continued demand for AI infrastructureExpansion of accelerated computing workloadsGrowing importance of networking and software ecosystems

Top Risks

Semiconductor manufacturing concentrationAdvanced packaging capacity constraintsHigh-bandwidth memory supply constraints
Continue to Dependency Graph ↓

NVIDIA is a leading semiconductor and computing platform company whose GPUs, networking technologies and software ecosystem occupy a central position in global AI infrastructure. NVIDIA has reserved the majority of TSMC's advanced CoWoS packaging capacity through 2027 for its Blackwell and next-generation Rubin GPUs, with 2026 CoWoS wafer demand estimated at roughly 60% of global capacity.

Leading Indicators

Hiring and patent filing trends — the underlying numbers Momentum is computed from. Insider filing activity is tracked separately under Sources below.

Steadydriven mostly by insider filing activity, up 1 since last check

Additional Intelligence Signals

Patent citation lineage, earnings-call mentions, and federal contract disclosures — automatically collected, not yet visible anywhere else on the site.

Earnings-call mentions

Mentioned by Netskope

Netskope joined NVIDIA's Open Secure AI Alliance, a coalition of industry leaders committed to building open, frontier AI tools that defenders can inspect, adapt, and trust.

SEC 8-K exhibit (0001193125-26-380188) · Sep 2, 2026

Mentioned by onsemi (ON Semiconductor)

Expanded role in NVIDIA MGX ecosystem as AI infrastructure power demands accelerate

SEC 8-K exhibit (0001140361-26-030989) · Aug 3, 2026

Mentioned by Lucid Group

Lucid s ability to enter into or maintain partnerships with original equipment manufacturers, vendors and technology providers, including its ability to realize the anticipated benefits of its partnerships with Aston Martin, Uber, Nuro and NVIDIA

SEC 8-K exhibit (0001628280-26-052548) · Aug 4, 2026

Mentioned by Firefly Aerospace

Announced collaboration with NVIDIA to enable rapid on-orbit processing in lunar orbit for Firefly's Ocula Moon imaging service, utilizing an NVIDIA Jetson module combined with Firefly's AI software on Elytra to rapidly process data on-orbit.

SEC 8-K exhibit (0001860160-26-000022) · Aug 11, 2026

Mentioned by Infleqtion

Infleqtion's systems are already in use by the U.S. Department of War, NASA, the U.K. government, and in multiple collaborations with NVIDIA. Infleqtion, in collaboration with NVIDIA, published the world s first demonstration of a materials science application using logical qubits.

SEC 8-K exhibit (0001628280-26-056222) · Aug 12, 2026

Sources

Every claim traced to a primary source — evidence, recent activity, and insider filing behavior, all in one place.

Evidence

27 sources · 1 government/SEC filing

  • U.S. Securities and Exchange Commission (EDGAR)NVIDIA Corporation FY2026 Annual Report (Form 10-K), filed with the SECgovernment
  • BloombergNvidia has $21 billion SpaceX stake, $30 billion in Intel sharesnews
  • SiliconAnalystsAMD vs NVIDIA AI GPU Market Share 2026research
  • BechtelBechtel to accelerate AI data center construction with NVIDIAcompany
  • Cadence Design SystemsCadence and NVIDIA expand partnership to reinvent engineering for the age of AI and accelerated computingcompany
  • RCR Wireless / CNBCNvidia commits $6.3B for CoreWeave's unused cloud capacitynews
  • 36Kr (citing Morgan Stanley research)NVIDIA estimated at ~60% of global CoWoS wafer demand for 2026research
  • NVIDIA NewsroomFoxconn builds AI factory in partnership with Taiwan and NVIDIAcompany
  • South China Morning Post / BloombergNVIDIA confirms first H200 shipments to China resume, but stay minimalnews
  • Hitachi EnergyHitachi Energy supports 800-volt architecture for next-generation data centerscompany
  • Bloomberg / TechCrunchNVIDIA reportedly in advanced talks to acquire Hugging Face for ~$12.9Bnews
  • CNBCNVIDIA to invest $4 billion into photonics companies Coherent and Lumentumnews
  • CNBC / Meta NewsroomMeta expands Nvidia deal to use millions of AI chips in data center build-out, including standalone CPUscompany
  • TrendForceMicron hikes capex to $20B with 2026 HBM supply fully booked, HBM4 ramps 2Q26research
  • Microsoft Azure BlogMicrosoft's strategic AI datacenter planning enables seamless, large-scale NVIDIA Rubin deploymentscompany
  • Nikkei AsiaNvidia, Mitsubishi Heavy eye cooperation on AI data center cooling and powernews
  • Investing.comNvidia discloses 9.3% stake in neocloud computing firm Nebiusnews
  • CNBCNvidia takes $1 billion stake in Nokianews
  • NVIDIA Newsroom / CNBCOpenAI and NVIDIA announce strategic partnership to deploy 10 gigawatts of NVIDIA systemscompany
  • CIO DiveOracle teams up with AMD, Nvidia to boost cloud infrastructurenews
  • NVIDIANVIDIA posts record $81.6B Q1 FY2027 revenue, up 85% YoY; unveils Vera Rubin platformcompany
  • NVIDIA NewsroomNVIDIA posts record $96.2B Q2 FY2027 revenue, up 106% YoY; guides FY2028 growth of 70%company
  • CNBC / NVIDIA Investor RelationsSK Group and NVIDIA expand strategic partnership across AI factories and next-generation memorycompany
  • NVIDIA NewsroomNVIDIA and Safe Superintelligence announce long-term partnership, $5B investmentcompany
  • Manufacturing DiveNvidia takes $2 billion stake in Synopsys as part of expanded partnershipnews
  • CNBCNVIDIA secures majority of TSMC's advanced CoWoS packaging capacitynews
  • Tom's Hardware / DatacenterDynamicsNvidia backs $20 billion xAI chip deal to support Colossus 2 Memphis projectnews

Insider Filing Activity

24Form 4 filings, trailing 90 days+1 since last week's snapshot

Counts filing frequency only — transaction direction/size wasn't parseable from the sampled filings · sourced from SEC EDGAR · as of Sep 7, 2026

Insider Timing

An insider disposed of 500,000 shares on Aug 5, 2026 9 days after a recorded milestone: “$5B investment and long-term partnership with Ilya Sutskever's Safe Superintelligence

Timing correlation only — not evidence of a causal link

An insider disposed of 500,000 shares on Jul 1, 2026 the same day a recorded milestone: “Rubin pulled forward; H20 China licenses resume

Timing correlation only — not evidence of a causal link

An insider acquired 1,211 shares on Jun 25, 2026 6 days before a recorded milestone: “Rubin pulled forward; H20 China licenses resume

Timing correlation only — not evidence of a causal link

Correlated Activity

Both NVIDIA and Naver Corporation which it depends on — are showing accelerating Activity at the same time (1 recorded change for Naver Corporation in the last 90 days).

Timing correlation only — not evidence of a causal link

Both NVIDIA and Yotta Data Services which it depends on — are showing accelerating Activity at the same time (1 recorded change for Yotta Data Services in the last 90 days).

Timing correlation only — not evidence of a causal link

Both NVIDIA and NXP Semiconductors which it depends on — are showing accelerating Activity at the same time (1 recorded change for NXP Semiconductors in the last 90 days).

Timing correlation only — not evidence of a causal link

Acquisition & Investment Fit

AI-reasoned, generated only from entities already in InsightNodes's own graph — a hypothetical strategic-fit exercise, not real M&A intelligence or a signal that any deal is planned or in progress.

Relationship Map

The relationships surrounding NVIDIA — ownership, dependencies, regulation, technology and market context. Click any node to make it the new center, 2 levels deep.

Connection type

Sign in free to click a node and explore →

Click any node to make it the new center. Scroll to zoom, drag to pan.

The Story So Far (last 6 months)

Aug 2026: First H200 shipments to China resume, but remain minimalAug 2026: Reportedly in advanced talks to acquire Hugging Face for ~$12.9BAug 2026: NVIDIA confirms first H200 shipments to China resume, but stay minimalAug 2026: NVIDIA reportedly in advanced talks to acquire Hugging Face for ~$12.9BAug 2026: First H200 shipments to China confirmed, but remain under 1% of Data Center revenue (unconfirmed)Aug 2026: NVIDIA reportedly nearing $12.9B Hugging Face acquisition (unconfirmed)

Auto-generated from this entity's dated milestones, relationship updates, and sourced evidence — not AI-written, just sorted.

Emerging Signals

AI Infrastructure Demand

Critical

Continued investment in artificial intelligence infrastructure supports demand for advanced accelerated computing platforms.

Custom AI Accelerators Threaten Inference Dominance

High

Custom ASIC accelerators from hyperscalers (AWS Trainium, Google TPU, Microsoft Maia) are projected to grow at roughly 44.6% CAGR, with some analysts projecting NVIDIA's share of the AI inference market could fall from around 90% today to as low as 20-30% by 2028 as hyperscalers increasingly deploy in-house silicon for inference workloads specifically.

Market Intelligence

Unverified

Credibly-reported claims — analyst notes, sourcing citing “people familiar with the matter,” deals where the companies involved declined to comment — that haven't been officially confirmed. Kept structurally separate from the sourced evidence above; treat as a lead worth researching further, not an established fact.

First H200 shipments to China confirmed, but remain under 1% of Data Center revenue

60% confidence

After months of Beijing steering domestic firms away from imports despite US export approval, NVIDIA confirmed on August 27, 2026 its first actual H200 shipments to China, with volume amounting to less than 1% of the $89.0 billion in Q2 FY2027 Data Center revenue. NVIDIA's $108 billion Q3 FY2027 guidance continued to assume zero China data-center compute revenue, reflecting persistent uncertainty over Beijing's appetite for US AI chip imports even where licensed.

Reported by the South China Morning Post and Bloomberg citing NVIDIA's own Q2 FY2027 earnings commentary and shipment disclosures; precise China unit volumes have not been separately broken out by NVIDIA.

South China Morning Post / Bloomberg · Aug 27, 2026

NVIDIA reportedly nearing $12.9B Hugging Face acquisition

50% confidence

NVIDIA was reported in late August 2026 to be in advanced talks to acquire Hugging Face for approximately $12.9 billion — which would be its largest deal on record, surpassing the $20 billion Groq IP/talent acquisition — extending NVIDIA's reach from silicon into AI model hosting and distribution. No signed agreement had been announced as of the reporting date, and the deal could still fall apart.

Reported by Bloomberg, TechCrunch, CNBC and Forbes citing people familiar with the matter; neither NVIDIA nor Hugging Face had confirmed a signed agreement.

Bloomberg / TechCrunch / CNBC · Aug 27, 2026

NVIDIA's Timeline

A sourced, dated history of NVIDIA's key moments — founding to present.

  1. Aug 2026 · Record Q2 FY2027 revenue of $96.2B, up 106% YoY; guides Q3 to $108B and FY2028 growth of 70%

    NVIDIA reported record fiscal Q2 2027 revenue of $96.2 billion (period ended July 26, 2026), up 106% year-over-year and 18% sequentially, beating consensus by roughly 4.5%; Data Center revenue reached $89.0 billion (~92% of total), GAAP/non-GAAP gross margin was 75.0%, and non-GAAP EPS of $2.22 beat estimates of $2.06-2.09. NVIDIA guided Q3 FY2027 revenue to $108.0 billion and, in an unusual move, forecast fiscal 2028 annual revenue growth of roughly 70% — well above the ~44% growth analysts had modeled — while continuing to assume zero China data-center compute revenue in that guidance.

  2. Aug 2026 · First H200 shipments to China resume, but remain minimal

    NVIDIA confirmed its first H200 AI chip shipments to China under a renewed US licensing scheme, ending a months-long lockout, though volume stayed below 1% of the $89.0 billion in Q2 FY2027 Data Center revenue; Beijing had restricted purchases even after Washington approved exports in January 2026, before allowing selected Chinese firms to buy limited quantities starting in July. NVIDIA's $108 billion Q3 FY2027 guidance continued to assume no China data-center compute revenue.

  3. Aug 2026 · Reportedly in advanced talks to acquire Hugging Face for ~$12.9B

    NVIDIA was reported to be in advanced, though not yet finalized, negotiations to acquire AI model-hosting and open-source platform Hugging Face for approximately $12.9 billion — a large step up from Hugging Face's $4.5 billion Series D valuation in August 2023 — that would extend NVIDIA's reach from AI chips into the software and model-hosting ecosystem where it already has deep integration via DGX Cloud Lepton and NIM microservices. As of early September 2026, no signed agreement had been announced and the deal could still fall apart.

How These Connections Evolved

How a relationship changed over time, not just its current state — sourced, dated, and traceable.

NVIDIAMicron Technology

  1. Jun 2024 · HBM3E qualification

    Micron's HBM3E memory was qualified for NVIDIA's Blackwell platform, narrowing the gap with SK hynix as NVIDIA diversified its HBM supplier base to reduce single-supplier risk.

  2. Jan 2026 · HBM4 certification, full contract

    Micron was certified as an HBM4 supplier for NVIDIA's Vera Rubin platform alongside SK hynix and Samsung, with its entire 2026 HBM supply fully contracted — reflecting a shift from a secondary to a core, capacity-constrained supplier relationship.

  3. Now

    Micron has been certified as an HBM4 memory supplier for NVIDIA's next-generation Vera Rubin AI platform, alongside SK hynix and Samsung, with its entire 2026 HBM supply fully contracted.

NVIDIAAlphabet (Google)

  1. Apr 2025 · Ironwood (TPU v7) launches, explicitly targeting inference

    Google announced Ironwood (TPU v7), its first TPU explicitly designed for large-scale AI inference, delivering roughly 10x the performance of its predecessor — positioning Google's own silicon as a genuine alternative to NVIDIA GPUs for inference workloads specifically, while NVIDIA GPUs remained dominant for training.

  2. Nov 2025 · Anthropic's record TPU deal signals real diversification away from NVIDIA

    Anthropic closed the largest TPU deal in Google's history, committing to hundreds of thousands of Trillium TPUs in 2026 scaling toward one million by 2027 — a concrete sign that at least one major AI lab is shifting meaningful compute away from NVIDIA GPUs toward Google's own silicon, even as NVIDIA continues supplying Google Cloud's external GPU-instance business.

  3. Now

    NVIDIA supplies GPUs to Google Cloud, including new Blackwell-powered G4 instances and planned Vera Rubin NVL72 rack-scale systems, even as Google simultaneously develops competing in-house TPU silicon.

NVIDIACUDA

  1. Jan 2025

    NVIDIA deepened CUDA's software moat through agentic-AI partnerships with Synopsys ($2B investment, AgentEngineer) and Cadence targeting chip-design and physical-AI workflows, reinforcing CUDA's ecosystem lock-in even as rivals pushed custom silicon.

  2. Now

    NVIDIA develops CUDA, the software platform that strengthens the ecosystem surrounding its accelerated computing products.

NVIDIABlackwell

  1. Dec 2024

    Reports emerged that Blackwell's initial GB200/B200 server ramp faced overheating, power-consumption, and interconnect issues, pushing TrendForce to project mass production and peak shipments slipping to Q2-Q3 2025 rather than earlier plans.

  2. Apr 2025

    Despite the earlier delay reports, GB200 NVL72 systems began reaching customers — WhiteFiber received its first shipment of Quanta-built GB200 Grace Blackwell Superchip systems, signaling volume production had started.

  3. Now

    NVIDIA develops the Blackwell GPU architecture for advanced artificial intelligence and accelerated computing workloads.

NVIDIATaiwan Semiconductor Manufacturing Company

  1. Jun 2024 · Blackwell ramp

    As NVIDIA began ramping its Blackwell GPU architecture, it moved to secure a larger, multi-year share of TSMC's expanding CoWoS packaging capacity to avoid the bottlenecks seen during the Hopper generation.

  2. Jun 2025 · Multi-year capacity lock-in

    NVIDIA reserved the majority of TSMC's advanced CoWoS packaging capacity through 2027 to support Blackwell and next-generation Rubin GPUs, reflecting the relationship's shift from opportunistic ordering to long-horizon capacity planning.

  3. Now

    NVIDIA depends heavily on TSMC for manufacturing many of its most advanced semiconductor products.

NVIDIAHigh Bandwidth Memory

  1. Oct 2025

    HBM3E 12-Hi memory began shipping into NVIDIA's B300 systems, with SK hynix holding roughly 62% HBM revenue share, Micron around 21%, and Samsung around 17% as the three qualified suppliers.

  2. Mar 2026

    SK hynix shipped the first HBM4 12-Hi samples to NVIDIA for the upcoming Rubin platform, reported as a 6-9 month lead over Samsung and Micron; NVIDIA separately requested next-generation 16-Hi HBM4 samples from all three suppliers by Q4 2026.

  3. Now

    Advanced NVIDIA AI accelerators depend on high-bandwidth memory to support data-intensive artificial intelligence workloads.

NVIDIAAdvanced Semiconductor Packaging

  1. Jan 2024

    NVIDIA moved to secure a larger, multi-year share of TSMC's expanding CoWoS advanced packaging capacity for Blackwell, aiming to avoid the industry-wide packaging bottlenecks that constrained the prior Hopper generation's ramp.

  2. Jan 2025

    NVIDIA reserved the majority of TSMC's advanced CoWoS packaging capacity through 2027 to cover both Blackwell and next-generation Rubin GPU production, underscoring packaging (not wafer fabrication alone) as a primary supply constraint.

  3. Now

    NVIDIA's advanced AI processors depend on sophisticated packaging technologies that integrate compute and memory components.

NVIDIAAdvanced Micro Devices

  1. Oct 2025 · OpenAI-AMD 6GW deal signals a marquee customer win

    AMD's competitive position strengthened materially when it signed a 6-gigawatt, multi-generation GPU supply deal with OpenAI — including a warrant for up to 10% of AMD's shares — its most significant customer win yet against NVIDIA for a frontier AI lab's compute.

  2. Jan 2026 · NVIDIA share projected to ease toward 75%

    Industry estimates projected NVIDIA's AI accelerator revenue share easing from its 2024 peak toward roughly 75% by 2026, as AMD's MI350 series (shipped to hyperscalers in Q3 2025) and hyperscalers' own custom ASICs (targeting 10-15% share) both gained ground.

  3. Now

    AMD competes with NVIDIA in accelerated computing and artificial intelligence processors.

NVIDIAAI Accelerators

  1. Jan 2024

    NVIDIA's Blackwell (GB200/GB300) architecture began shipping to hyperscalers, though production faced widely reported delays tied to packaging and memory supply constraints.

  2. 2025–2026

    NVIDIA advanced its next-generation Vera Rubin platform, certifying Micron, SK hynix, and Samsung as HBM4 suppliers with 2026 HBM supply fully contracted ahead of launch.

  3. Now

    NVIDIA develops AI accelerators used to train and operate advanced artificial intelligence systems.

NVIDIAAI Data Centers

  1. Jan 2025

    Combined hyperscaler capex nearly doubled to roughly $410 billion as the AI infrastructure buildout accelerated further.

  2. Jan 2026

    Combined hyperscaler capex guidance reached roughly $725 billion — Amazon at $200B, Google at $175-185B, Meta at $115-135B, and Microsoft at $110-120B — a roughly 62% increase over 2025, with analysts projecting the big four could exceed $1 trillion combined by 2027.

  3. Now

    Demand for NVIDIA computing platforms contributes to investment in AI-focused data-center infrastructure.

NVIDIACoreWeave

  1. Apr 2023 · Early strategic customer and investor

    NVIDIA became an early strategic investor and priority GPU supplier to CoreWeave, then a smaller cloud infrastructure provider, helping it scale into one of the largest NVIDIA-GPU-focused "neocloud" providers ahead of the broader 2024-2025 AI infrastructure boom.

  2. Jan 2026 · $2B additional investment, Rubin/Vera integration

    NVIDIA invested a further $2 billion in CoreWeave at $87.20 per share to help it add more than 5 gigawatts of AI compute capacity by 2030, expanding their collaboration to include NVIDIA's upcoming Rubin GPU architecture, Bluefield storage, and Vera CPU line — on top of NVIDIA's prior commitment to buy more than $6 billion in services from CoreWeave through 2032.

    Source
  3. Now

    NVIDIA supplies GPUs to CoreWeave and has invested directly in the company to accelerate its AI infrastructure buildout.

NVIDIAMicrosoft Azure

  1. Jan 2024

    Microsoft launched its first in-house AI chip, Maia 100, and announced three successors (codenamed Braga, Braga-R, and Clea) planned for 2025-2027, an explicit hedge against depending on NVIDIA for 94%+ of the GPU market.

  2. Oct 2025

    Reports indicated Microsoft's follow-on Maia chip (Braga/Maia 200) mass production slipped into 2026 due to design changes and staff turnover, even as Microsoft's CTO publicly pushed to reduce reliance on NVIDIA and AMD GPUs.

  3. Now

    NVIDIA supplies large volumes of GPUs to Microsoft Azure to meet hyperscale AI compute demand.

NVIDIAAmazon Web Services

  1. Jan 2024 · Trainium2 deployed at scale for Anthropic's Project Rainier

    AWS deployed Trainium2 at scale — including a 400,000-chip cluster ("Project Rainier") for Anthropic — while continuing to run large amounts of NVIDIA GPU capacity for other customers, showing Trainium supplementing rather than replacing NVIDIA within AWS's infrastructure.

  2. Dec 2025 · Trainium3 launches, but roadmap stays NVIDIA-interoperable

    AWS launched Trainium3, its first 3nm AI chip, while teasing an NVIDIA-friendly roadmap: the next-generation Trainium4 is planned to support NVIDIA's NVLink Fusion interconnect, allowing Trainium and NVIDIA GPUs to interoperate in the same clusters rather than AWS pursuing full silicon independence from NVIDIA.

    Source
  3. Now

    NVIDIA supplies GPUs to AWS to meet hyperscale AI compute demand, alongside AWS's own custom silicon efforts.

NVIDIANVLink

  1. Jan 2024

    Fifth-generation NVLink shipped with the Blackwell platform, enabling up to 72 GPUs to operate as a single coherent fabric within the GB200 NVL72 rack-scale system, a major scale-up from prior generations' smaller GPU pod sizes.

  2. Jan 2026

    NVIDIA outlined a roadmap extending NVLink-based rack-scale coherence toward NVL1152 configurations, alongside co-packaged optics, to further scale the number of GPUs operating as a single fabric within future AI factory designs.

  3. Now

    NVIDIA develops NVLink as its proprietary GPU-to-GPU interconnect, exclusive to NVIDIA hardware.

NVIDIAInfiniBand (NVIDIA Quantum)

  1. Mar 2024

    NVIDIA announced the X800 series — Quantum-X800 InfiniBand and Spectrum-X800 Ethernet — the first networking platforms capable of end-to-end 800Gb/s throughput, adopting a two-pronged strategy of InfiniBand for the highest-performance dedicated AI infrastructure and Ethernet for broader AI-optimized data centers.

  2. Jan 2025

    InfiniBand switch sales surged as NVIDIA's Blackwell Ultra platform drove 800Gbps networking demand, with InfiniBand retaining the top-performance tier even as Ethernet (Spectrum-X) held overall market leadership for AI back-end networks.

  3. Now

    NVIDIA develops its Quantum InfiniBand networking platform following its acquisition of Mellanox.

NVIDIASynopsys

  1. Dec 2025

    NVIDIA and Synopsys announced an expanded strategic partnership integrating Synopsys' AgentEngineer technology with NVIDIA's agentic AI stack (NIM microservices, NeMo Agent Toolkit, Nemotron models) for autonomous EDA and simulation workflows, alongside a $2 billion NVIDIA investment in Synopsys common stock.

  2. Now

    NVIDIA depends on Synopsys electronic design automation software to design its advanced chips.

NVIDIACadence Design Systems

  1. Jan 2026

    Cadence expanded its partnership with NVIDIA to combine Cadence's agentic AI-driven EDA and system design tools with NVIDIA's CUDA-X, AI physics, and Omniverse libraries, extending the relationship into physical AI systems and hyperscale AI factory design.

  2. Now

    NVIDIA depends on Cadence electronic design automation software to design its advanced chips.

NVIDIACo-Packaged Optics

  1. Jan 2025

    NVIDIA announced Spectrum-X Photonics and Quantum-X Photonics co-packaged optics switches, designed to connect millions of GPUs across AI factories while cutting laser count 4x and improving power efficiency roughly 3.5x versus traditional optical networking.

  2. Jan 2026

    Quantum-X Photonics switches (144 ports at 800Gbps, liquid-cooled) began reaching customers in early 2026, with Spectrum-X Photonics Ethernet variants following from infrastructure partners the same year — positioning co-packaged optics as an increasingly standard requirement for next-generation AI data centers.

  3. Now

    NVIDIA develops co-packaged optics switches, including Quantum-X Photonics and Spectrum-X Photonics, for next-generation AI cluster networking.

NVIDIAOpenAI

  1. Dec 2025

    Reports indicated the deal had been quietly scaled back to roughly $30 billion, amid Wall Street scrutiny of "circular" arrangements where NVIDIA invests in a customer that uses the funds to buy NVIDIA's own chips.

  2. Feb 2026

    Roughly $30 billion in NVIDIA investment was finalized as part of OpenAI's ~$110 billion funding round, though reporting noted that five months after the original announcement, no binding contract had been signed and no funds had changed hands on the broader $100 billion framework.

  3. Now

    NVIDIA committed $30 billion as a lead investor in OpenAI's 2026 funding round, alongside its role as OpenAI's primary GPU supplier.

NVIDIAAnthropic

  1. Nov 2025 · Up to $10B investment + Microsoft strategic partnership

    NVIDIA and Microsoft jointly announced strategic partnerships with Anthropic, with NVIDIA committing up to $10 billion and Microsoft up to $5 billion — a notable shift for NVIDIA, which had no direct equity relationship with Anthropic before this point despite Anthropic's Claude models running heavily on NVIDIA hardware via its cloud partners.

    Source
  2. Mar 2026 · Investment finalized in the same week as the $30B OpenAI deal

    NVIDIA finalized its roughly $10 billion stake in Anthropic in the same week it finalized its $30 billion investment in OpenAI, with CEO Jensen Huang saying shortly after that both were likely to be NVIDIA's last major equity checks into either lab, as both were expected to go public later in 2026.

    Source
  3. Now

    NVIDIA committed up to $10 billion to invest in Anthropic alongside a strategic partnership with Microsoft, and will help optimize Claude models for performance, efficiency and total cost of ownership.

NVIDIAMeta

  1. Jan 2024 · Meta becomes NVIDIA's largest single H100 buyer

    Meta became the largest individual buyer of NVIDIA's H100 GPUs, even as it rolled out an improved MTIA v2 ("MTIA 300") with roughly 3x the performance-per-watt of v1 for its ranking and recommendation workloads.

  2. Feb 2026 · Meta buys "millions more" NVIDIA chips despite custom silicon push

    Meta agreed to buy millions more AI chips from NVIDIA (spanning Blackwell and the newly announced Vera Rubin platform) even while announcing four new generations of custom MTIA silicon (300/400/450/500) weeks later — underscoring that custom chips are supplementing, not replacing, NVIDIA as Meta's primary AI compute supplier.

    Source
  3. Now

    NVIDIA supplies millions of AI chips for Meta's data center build-out under an expanded 2026 partnership, a deal analysts describe as certainly in the tens of billions of dollars.

NVIDIAUS AI Chip Export Controls

  1. Jul 2025

    Licensed H20 sales to China were approved again after the earlier freeze, following a policy reversal easing the country-tiered restriction approach.

  2. Dec 2025

    The US administration announced a one-year waiver of export restrictions on NVIDIA's H200 chips, giving Chinese firms legal access to NVIDIA's Hopper chip line.

  3. Now

    NVIDIA's chip sales to China are regulated by US export controls, which determine which chip generations can be sold and under what licensing conditions.

NVIDIAJensen Huang

  1. Jan 1993

    Jensen Huang co-founded NVIDIA and has served as CEO continuously since, guiding the company from a graphics-chip startup to the central supplier of AI accelerated-computing infrastructure.

  2. Now

    NVIDIA was co-founded by Jensen Huang, who has served as its CEO throughout the company's history.

NVIDIAxAI

  1. Jan 2024

    xAI's Colossus in Memphis scaled from roughly 100,000 to 200,000 NVIDIA H100-class GPUs, one of the fastest large-scale GPU cluster buildouts to date.

  2. 2025–2026

    xAI acquired land for a Colossus 2 expansion and is targeting roughly 555,000 NVIDIA GPUs and about 2GW of power capacity as it scales toward frontier-model training.

  3. Now

    NVIDIA supplies the GPUs powering xAI's Colossus supercomputer clusters, among the largest known concentrations of NVIDIA hardware built for frontier AI training.

NVIDIAG42 / MGX (UAE)

  1. Jan 2026

    The UAE received its first shipment of advanced NVIDIA chips for the Stargate UAE campus developed with G42, following a U.S. government export-license framework enabling the deal.

  2. Now

    NVIDIA supplies chips for the UAE's Stargate campus, developed by G42, with the UAE receiving its first NVIDIA chip shipment in 2026.

NVIDIASaudi PIF / HUMAIN

  1. 2025–2026

    NVIDIA agreed to supply GB300 Blackwell Ultra chips to HUMAIN, Saudi Arabia's PIF-backed AI company, as part of the kingdom's push to build sovereign national AI compute capacity.

  2. Now

    NVIDIA supplies GB300 chips to Saudi Arabia's HUMAIN, backed by the Public Investment Fund, to build out national AI compute capacity.

NVIDIASK hynix

  1. Jan 2026 · HBM4 volume/pricing contracts finalized alongside Micron and Samsung

    SK hynix, alongside Micron and (with more limited volume) Samsung after its delayed HBM3E qualification finally passed in September 2025, moved into finalized HBM4 volume and pricing contracts with NVIDIA for the Vera Rubin platform — SK hynix retaining the largest share of the three qualified suppliers.

  2. Jul 2026 · SK Group and NVIDIA sign $500B+ letters of intent spanning AI factories and HBM4

    SK Group and NVIDIA signed letters of intent for a partnership valued at more than $500 billion, under which SK Telecom will build a 2-gigawatt Korean AI data center on NVIDIA's Vera Rubin platform (first phase targeted for 2027) while SK hynix deepens co-development of HBM4 memory with NVIDIA, aimed at easing the memory supply constraints that have become a binding bottleneck on global AI system scaling.

  3. Now

    SK hynix supplies advanced memory products used in NVIDIA artificial intelligence computing platforms.

NVIDIAAI Data Centers

  1. 2024–2026

    NVIDIA GPUs remained the dominant compute platform behind hyperscaler AI data-center buildouts as combined big-four capex rose from roughly $226B (2024) to $410B (2025) to a projected $725B (2026).

  2. Now

    Many AI data-center deployments depend on NVIDIA accelerated computing platforms.

NVIDIAOpenAI

  1. Sep 2025

    NVIDIA and OpenAI announced a $100 billion strategic partnership tied to 10 gigawatts of NVIDIA systems deployment, positioning NVIDIA as both OpenAI's primary compute supplier and a lead investor in the same buildout.

  2. Feb 2026

    The investment side of the arrangement was finalized at roughly $30 billion within OpenAI's ~$110 billion funding round, while the GPU-supply relationship continued independent of the broader $100 billion framework still being finalized.

  3. Now

    OpenAI depends on massive NVIDIA GPU purchases for model training and inference, with NVIDIA committing $30 billion as a lead investor in OpenAI's 2026 funding round.

NVIDIAOracle

  1. 2024–2026

    Oracle Cloud Infrastructure scaled large NVIDIA GPU clusters (including Blackwell-based systems) to support major AI training workloads, including its role in the Stargate data-center initiative.

  2. Now

    Oracle depends on NVIDIA GPU supply for its AI training infrastructure, including data centers built around large NVIDIA GPU clusters.

NVIDIAMicrosoft

  1. Jan 2024 · Three successor chips planned (Braga, Braga-R, Clea)

    Microsoft began developing three successor generations to Maia 100 (codenamed Braga, Braga-R, and Clea, planned for 2025-2027) even as it remained NVIDIA's largest customer by revenue, spending billions annually on NVIDIA chips for Azure.

  2. Jan 2026 · Maia 200 ships, explicitly targeting reduced NVIDIA reliance

    Microsoft shipped its second-generation Maia 200 chip (delayed from an original 2025 target) to its Iowa data center, explicitly framed as reducing reliance on NVIDIA chips for inference workloads — while continuing to depend on NVIDIA GPUs as its primary AI training infrastructure.

    Source
  3. Now

    Microsoft purchases large volumes of NVIDIA GPUs to build out Azure's AI infrastructure.

NVIDIAAmazon

  1. Jan 2024 · Dual-track spending: NVIDIA GPUs and Trainium2 scale together

    Amazon deployed large volumes of NVIDIA Hopper GPUs while simultaneously investing billions in Trainium2 clusters, as combined hyperscaler AI capex roughly tripled industry-wide from about $226 billion in 2024 toward $410 billion in 2025 — Amazon's NVIDIA and custom-silicon spending both grew rather than one displacing the other.

  2. Oct 2025 · Trainium sales commitments reach $225B; ASIC share still growing fast

    Amazon's Trainium sales commitments reached roughly $225 billion (including from OpenAI and Anthropic), with AWS's ASIC shipments expected to more than double in 2025 — the fastest growth among major cloud providers — while Amazon continued deploying NVIDIA Blackwell GPUs at scale for the training workloads Trainium doesn't yet fully cover.

  3. Now

    Amazon purchases NVIDIA GPUs at scale for AWS AI infrastructure alongside its own custom silicon.

NVIDIAFoxconn

  1. 2024–2025

    Foxconn served as the sole system assembler for NVIDIA's Blackwell GB200 AI servers, making its Mexico and Taiwan assembly capacity a critical bottleneck during the widely reported Blackwell production ramp delays.

  2. Now

    Foxconn assembles NVIDIA's Blackwell GB200 AI servers as the sole assembler, making it a critical bottleneck point in the AI data center supply chain.