Semiconductor Manufacturing
Tata Electronics
Tata Group's semiconductor arm building India's first commercial front-end wafer fabrication facility, a greenfield fab in Dholera, Gujarat, developed with Taiwan's Powerchip Semiconductor Manufacturing Corporation (PSMC). The plant will start on 90nm process technology before expanding toward 28nm, with a planned capacity of roughly 50,000 wafers per month for analog and logic chips. Pilot wafer testing is scheduled for December 2026, with commercial mass production targeted for Q2 2027 — a foundational step in India's push to build domestic chip-manufacturing capacity alongside the assembly/test operations already running at Micron's Sanand plant.
Sources
Every claim traced to a primary source — evidence, recent activity, and insider filing behavior, all in one place.
Evidence
1 source · 58% avg. source confidence
- DholeraAcres / Digitimes reporting — Tata Electronics 300mm Semiconductor Fab: Dholera's Dec 2026 Production Timeline58% source confidence
Dependency Map
What Tata Electronics depends on below, and who depends on Tata Electronics above — click any node to make it the new center, 3 levels deep.
Click any node to make it the new center. Scroll to zoom, drag to pan.
The Story So Far
Auto-generated from this entity's dated milestones, relationship updates, and sourced evidence — not AI-written, just sorted.
Tata Electronics's Timeline
A sourced, dated history of Tata Electronics's key moments — founding to present.
Sep 2024 · Dholera fab construction begins
Tata Electronics began construction of India's first commercial semiconductor wafer fab in Dholera, Gujarat, in partnership with PSMC.
Dec 2026 · Pilot wafer testing targeted
First test chips and pilot wafer testing at the Dholera fab are scheduled, using 90nm process technology.