Semiconductor Manufacturing

Tata Electronics

High60% confidenceProfile verified Jul 27, 2026

Tata Group's semiconductor arm building India's first commercial front-end wafer fabrication facility, a greenfield fab in Dholera, Gujarat, developed with Taiwan's Powerchip Semiconductor Manufacturing Corporation (PSMC). The plant will start on 90nm process technology before expanding toward 28nm, with a planned capacity of roughly 50,000 wafers per month for analog and logic chips. Pilot wafer testing is scheduled for December 2026, with commercial mass production targeted for Q2 2027 — a foundational step in India's push to build domestic chip-manufacturing capacity alongside the assembly/test operations already running at Micron's Sanand plant.

Sources

Every claim traced to a primary source — evidence, recent activity, and insider filing behavior, all in one place.

Evidence

1 source · 58% avg. source confidence

Dependency Map

What Tata Electronics depends on below, and who depends on Tata Electronics above — click any node to make it the new center, 2 levels deep.

No dependencies, beneficiaries or direct connections found yet.

Click any node to make it the new center. Scroll to zoom, drag to pan.

The Story So Far

Sep 2024: Dholera fab construction beginsJun 2026: Tata Electronics 300mm Semiconductor Fab: Dholera's Dec 2026 Production TimelineDec 2026: Pilot wafer testing targeted

Auto-generated from this entity's dated milestones, relationship updates, and sourced evidence — not AI-written, just sorted.

Tata Electronics's Timeline

A sourced, dated history of Tata Electronics's key moments — founding to present.

  1. Sep 2024 · Dholera fab construction begins

    Tata Electronics began construction of India's first commercial semiconductor wafer fab in Dholera, Gujarat, in partnership with PSMC.

  2. Dec 2026 · Pilot wafer testing targeted

    First test chips and pilot wafer testing at the Dholera fab are scheduled, using 90nm process technology.